![](http://web.archive.org/web/20200919234002im_/https://philamirror.info/wp-content/uploads/2020/09/swiss-senery-stamps.jpg)
The opening of the Ceneri Base Tunnel in December 2020 will mark the completion of the New Rail Link through the Alps (NRLA), turning the long-held dream of a at rail link through the Alps into reality.The NRLA provides Switzerland with modern, high-performance rail infra- structure on Europe’s north-south corridor – and an environmentally-friendly alternative to road transport and travel. The opening of the Ceneri Base Tunnel is not just the nal part of the Rhine-Alps corridor, an epic feat of engineering, but also a symbol of northern and southern Europe moving closer together.
Issue Date:27.08.2020 Printer:Gutenberg AG, Schaan, Liechtenstein Process:Offset Colours:4-colour Size:33 × 37 mm
![Related Posts with Thumbnails](http://web.archive.org/web/20200919234002im_/http://www.linkwithin.com/pixel.png)